Strip-out
Removal of old floors, tiles, kitchen and sanitary ware, with debris taken away.
In a full renovation the hard part is not the works, it is coordinating them. We do the study, cost everything in detail and supervise all crews in the right order, so you don't have to.
All works in one overall design, in the right order and on one timeline.
Removal of old floors, tiles, kitchen and sanitary ware, with debris taken away.
New supply and drainage pipes for bathroom, kitchen and laundry.
New consumer unit with breakers and RCD, new wiring, sockets, switches, lighting, circuits for air conditioning and appliances, and internet/TV in every room.
Plasterboard walls, false ceilings and hidden lighting where it suits.
Complete bathroom and kitchen renovation within the same design.
New floors, painting, interior doors and better-insulated windows.
For homes we provide the study, design and supervision (project management) and recommend reliable, specialised crews for the works, so you have one person to talk to about everything.


For an apartment of about 70–100 m², usually 2 to 4 months, depending on the works, materials and approvals needed. The detailed timeline is part of the quote.
Yes. We send you photos and updates at every stage, so you don't need to be in Greece. Many of our clients are Golden Visa buyers who renovate the home they bought.
We handle the study, the costing and supervision at every stage. The works are carried out by reliable, specialised crews that we recommend and work with.
Yes. New clients get 20% off all works for jobs agreed by 31/12/2026.
Yes. We have offices in Athens (Agia Paraskevi) and Corfu. For other areas, ask us.
Send us a few words and we will reply with the next steps. You can also send photos of the space on WhatsApp.